Skip to content
+998-71-269-01-72
English
Русский
Search:
“TECHNOKONT” LLC
Design and commissioning of automated process control systems
Main
About Company
News
Projects
Services
Partners
Contacts
Main
About Company
News
Projects
Services
Partners
Contacts
Completed projects
You are here:
Home
Completed projects
Project “Construction of the Kandym Gas Processing Plant Collection System”
Project “100 MW Utility Scale Solar PV Plant for Uzbekistan Scaling Solar Project “
SHURTAN GPZ (gas processing plant). Stalling and surging compressor tests on GPA #3,4,5,6,7,8,9.
SHURTAN GPZ (gas processing plant). Project «Modernisation of GPA 3».
SHURTAN GPZ (gas processing plant). Project «Construction of GPA 10»
Mubarek GPZ (gas processing plant)
Mubarek GPZ (gas processing plant).
Project “Plant for the production of nitric acid”
Project “Reconstruction of a sports complex for a club 300 m
Project “Construction of the production of ammonia and urea at Navoiazot JSC”
Project “Construction of a complex for the production of polyvinyl chloride, caustic soda and methanol on the basis of Navoiazot JSC
Project “Construction of the Kandym Gas Processing Plant Collection System”
“Expansion of the automated process control system for GSP-1 at Dzharkuduk-Yangi Kyzylcha field for connecting wells No. 74, 75“ project
“Sulfur granulation unit for “Mubarekskiy GPZ” LLC” project
“Utilization of low-pressure gas from the Southern Kemachi, Kruk, Western Kruk, Northern Urtabulak and Umid fields” project
“Construction of 28 wells for a group of fields and construction of gas booster compressor station “Northern Nishan“ project.
Complex gas treatment unit at Dzharkuduk-Yangi Kyzylcha field (“Gissar”)
“Alan” oil and gas field Construction of gas booster compressor station “Alan”.
“Gissar comprehensive development” project Field support base at Dzharkuduk-Yangi Kyzylcha field, South-Western Gissar
“Shurtan” oil and gas field Construction of gas booster compressor station DKS-2 “Shurtan”
“Gissar comprehensive development” project Construction of two 110/10kV transformer substations at Dzharkuduk-Yangi Kyzylcha and Adamtash fields in the South-Western Gissar
UOG (gas dehydration unit) Gas dehydration unit construction on “Gazli” booster compressor station
“Shurtan” gas processing plant Construction of booster compressor station DKS for UPPBS (propane-butane mixture production unit)-5
“Urtabulak” gas field Construction of booster compressor station
Navoi CHP plant Construction of booster compressor station for 478 MW CCGT unit on Navoi CHP plant
“Djarkuduk Jangi Kizilcha” gas field from Gissar group of fields GSP-1 (gas gathering station)
Mubarek GPZ (gas processing plant) UPPBS (propane-butane mixture production unit), UOG (gas dehydration unit), and DKS (booster compressor station) construction on Mubarek gas processing plant
ChNPZ (Chinaz oil processing plant) Construction of oil processing plant in Chinaz
“Shurtan” gas processing plant Construction of propane-butane mixture production unit, 3rd, 4th sets
“Kungrad” compressor station Section-A (GT-750-b)
“Kokdumalak” oil and gas field Low-pressure associated dissolved gas recovery, booster compressor stations DKS№2, DKS№3 (SP№2, SP№3, SP№6) (SP – gas collecting station)
“Kokdumalak” oil and gas field Construction of DKS (booster compressor station) for low-pressure associated dissolved gas recovery on SP-2 and SP-6 (SP – gas collecting station)
“Shurtan” gas processing plant Propane-butane mixture production unit, 3rd, 4th sets
“Shurtan” oil and gas field DKS “Shurtan” booster compressor station (Bateman project)
Go to Top