Project “Construction of the Kandym Gas Processing Plant Collection System”

Location: Republic of Uzbekistan, Bukhara Region. Customer: «Lukoil Uzbekistan Operating Company». Year of construction: 2021-….y. General supplier: «KNGSR» LLC. Performed activities: –    Start-up and adjustment work on automated process control systems; –     Commissioning of electrical equipment; -Commissioning works on electrochemical protection (ECP); -Electrical, cabels, lighting and automatical equipment installation works;

SHURTAN GPZ (gas processing plant). Project «Modernisation of GPA 3».

Location: Republic of Uzbekistan, Kashkadarya region. Customer: «SHURTANNEFTGAZ» LLC. Year of construction: 2021-… y. Performed activities: -High level and midrange layers automation software adjustment; -Emerson based automated process control system design; -Automated process control, automated fire detection, control valves, electrical and mounting  equipment supply; -Emerson based control cabinets assembly production;

SHURTAN GPZ (gas processing plant). Project «Construction of GPA 10»

Engine NK-16-18-STD. Compressor made by Sumy Machine-Building Science-and-Production Association– Engineering” Location: Republic of Uzbekistan, Kashkadarya region. Customer: «SHURTANNEFTGAZ» LLC. Year of construction: 2021-… y. Performed activities: -High level and midrange layers automation software adjustment; -Emerson based automated process control system design; -Automated process control, automated fire detection, control valves, electrical and mounting  equipment supply; -Emerson…

Mubarek GPZ (gas processing plant)

Project «Construction of GPA 500». Compressor made by Sumy Machine-Building Science-and-Production Association– Engineering” Location: Republic of Uzbekistan, Kashkadarya region. Customer: «MUBAREKNEFTGAZ» LLC. Year of construction: 2020 y. Performed activities: -High level and midrange layers automation software adjustment; -Emerson based automated process control system design. -Automated process control, automated fire detection, control valves, electrical and mounting…

Mubarek GPZ (gas processing plant).

Mubarek GPZ (gas processing plant). Project «Construction of Booster GPA». Based on gasoturbine engine AI-336, JSC Motor Sich. Compressor made by Sumy Machine-Building Science-and-Production Association– Engineering” Location: Republic of Uzbekistan, Kashkadarya region. Customer: «MUBAREKNEFTGAZ» LLC. Year of construction: 2020 y. Performed activities: -Software adjustment; -Automated process control, automated fire detection, control valves, electrical and mounting…

Project “Plant for the production of nitric acid”

Location: Republic of Uzbekistan Navoiy City. Customer: «NAVOIYAZOT» JSC. Year of construction: 2019 – 2020 гг. General supplier: «CASALE S.A.». Performed activities: –    Start-up and adjustment work on automated process control systems; –     Commissioning of electrical equipment; -Commissioning works on electrochemical protection (ECP) -Electrical, cabels, lighting and automatical equipment installation works;

Project “Reconstruction of a sports complex for a club 300 m

Project “Reconstruction of a sports complex for a club 300 m, a situational center, a media center, a press center, international reception halls, office rooms with utility networks and the arrangement of the adjacent territory” Location: Republic of Uzbekistan Tashkent City. Customer: «TASHKENT CITY ADMINISTRATION». Year of construction: 2018 – 2019 гг. Performed activities: Installation…