“Gissar comprehensive development” project Construction of two 110/10kV transformer substations at Dzharkuduk-Yangi Kyzylcha and Adamtash fields in the South-Western Gissar

Facility location: Republic of Uzbekistan, Kashkadarya Region. Customer: «LUKOIL Uzbekistan Operating Company» LLC Year of construction: 2015 Performed activities: Commissioning of electrical equipment. A complete set of high-voltage tests of modern equipment (switching equipment, microprocessor relay protection and automation devices ABB REF615, 630, microprocessor control and protection modules for power step-down transformers) by “Bresler” from…

UOG (gas dehydration unit) Gas dehydration unit construction on “Gazli” booster compressor station

Facility location: Republic of Uzbekistan, Bukhara Region, Gazli. Customer: “Uztransgaz” JSC Year of construction: 2014 Performed activities: GE Fanuc PLCs based automated process control system design. Process control software development. Assembly of control cabinets for automated process control system. Commissioning of automated process control system, electrical equipment, automated fire detection and extinguishing system, and gas…

“Shurtan” gas processing plant Construction of booster compressor station DKS for UPPBS (propane-butane mixture production unit)-5

GPA-16 “Volga” manufactured by OJSC “KMPO” is designed on the basis of NK-16-18ST gas turbine and equipped with PJSC «Sumy NPO» manufactured compressor. Facility location: Republic of Uzbekistan, Kashkadarya Region, Karshi. Customer: “Shurtanneftegas” unitary subsidiary enterprise Year of construction: 2013 Performed activities: Allen Bradley PLCs based automated process control system design. Process control software development…

“Urtabulak” gas field Construction of booster compressor station

Facility location: Republic of Uzbekistan, Kashkadarya Region. Customer: “Mubarekneftegas” unitary subsidiary enterprise Year of construction: 2013 Performed activities: Commissioning of automated process control system, electrical equipment, automated fire detection and extinguishing system and, gas contamination control system. Allen Bradley PLCs based automated process control, ESD, automated fire detection and extinguishing, and gas contamination control systems…

Navoi CHP plant Construction of booster compressor station for 478 MW CCGT unit on Navoi CHP plant

Facility location: Republic of Uzbekistan, Navoi Region. Customer: “Navoi CHP plant” OJSC Year of construction: 2012 Performed activities: Commissioning of automated process control system, electrical equipment, automated fire detection and extinguishing system, and gas contamination control system. Mechanical setup of booster compressor station equipment.

Mubarek GPZ (gas processing plant) UPPBS (propane-butane mixture production unit), UOG (gas dehydration unit), and DKS (booster compressor station) construction on Mubarek gas processing plant

Facility location: Republic of Uzbekistan, Kashkadarya Region, Mubarek. Customer: “Mubarek GPZ” unitary subsidiary enterprise Construction period: 2011 – 2013 Performed activities: Commissioning of automated process control systems, electrical equipment, automated fire detection and extinguishing systems, and gas contamination control systems for UOG (gas dehydration unit), and DKS (booster compressor station). GE Fanuc control equipment based…